FAQs Single template

Before making electrical connections, isolate power, confirm the supply voltage and frequency match the instrument rating plate, and ensure any required external switches or fuses are installed.

Run cables through the cable glands, wire them to the labelled terminals, tighten the glands to maintain the IP seal, and close and lock the door after use.