FAQs Single template
Mount AIR XS vertically on a suitable surface using the integrated mounting brackets. Isolate power before electrical connections, ensure the supply matches the rating plate, run cables through the bottom cable glands, wire to the relevant terminals, tighten glands to maintain the IP seal, and close and lock the door after use.
Ensure the particulate entry and exit ports are not restricted or covered.