FAQs Single template

For AIR XD, XD1+, and XD ONE, high dust loading is described as 10 mg/m3 or above, with an expected maintenance schedule of 1 to 3 months.

The manuals state that particulate type and operating environment vary, so this should be used as a guide rather than a fixed rule for every site.