SUPPORTING UNDERGROUND HEALTH AND SAFETY IN REAL TIME

Customer / End User

STRABAG

Application

Mineral Transportation

Industry

Tunnelling

Country

United Kingdom

Product(s) used

TX8005 AIR XD
TX9165 SENTRO 8
TX6351-2 SENTRO 1
TX6648.40 IS Battery Back Up

Challenge

STRABAG are constructing the world’s longest conveyor tunnel, 36.7 km long for the transportation tens of millions of tonnes of Polyhalite. Demonstrating the scale of tunnelling and underground construction capabilities in the UK, it’s also highlighted the need for innovation and social responsibility throughout the process.

Outcome

Trolex were selected to supply a range of AIR X real-time particulate monitors and audio/visual alarms to monitor for PM2.5 to PM10 constantly, as well as gas detectors, sensors, and logic systems which constantly watch for key gases such as CH4, CO, NO, H2S, SO2 and O2.

TROLEX REAL-TIME AIR XD AND SENTRO 8 GAS DETECTOR

Company & Application

STRABAG UK’s tunnelling project, based in North Yorkshire, UK, is being constructing as the world’s longest conveyor tunnel, known as the Mineral Transport System, as part of the Woodsmith mine development. This project will see transportation of tens of millions of tonnes of Polyhalite, a naturally occurring mineral substance and subsequently when crushed, POLY4, a multi-nutrient fertiliser used worldwide.

The project began launching a Tunnel Boring Machine to commence a 36.7km long tunnel, which was constructed using a single shield machine. This length of tunnel is expected to be a new world record with the tunnel fit out, including a new full length conveyor system.

The Challenge

The project demonstrates the scale of the tunnelling and underground construction capabilities in the UK, also highlighting the need for focus on innovation and social responsibility throughout all processes. The 380 m-deep shafts were constructed using the blind-bore method, not only with the aim of reducing carbon emissions, but also to improve general on-site safety. Extensive air quality monitoring was required throughout the entire project and, notably, Trolex systems were fitted to ensure reliable and accurate monitoring is available and maintained throughout the entire project.

“This really is a pioneering project, and we are honoured to be able to provide a robust reliable and accurate set of sensors combined with modern logic to help keep workers safe and operations running efficiently and with minimum down time.”

Steve Holland

Managing Director, Trolex

TX9165 SENTRO 8 AND TX6648.40 TROLEX POWER SUPPLY

The Trolex plan

A range of Trolex real-time solutions have been identified for use in the STRABAG project for the detection of hazardous gases and dusts in this tunnelling project. 236 devices, including SENTRO 8 Gas detector, SENTRO single Gas detectors and AIR X real-time Particulate Monitors have been fitted across multiple systems with a total of 824 individual sensors for both gas detection and dust monitoring.

As well as particulate ranges from PM2.5 to PM10 being constantly monitored, logic systems constantly watch for key gases such as CH4, CO, NO, H2S, SO2 and O2. Local emergency Audio/Visual alarms, Trolex Flow Sensors and Intrinsically Safe Battery Back-Up units have been added to back up the system and add intelligent data to the data all powered by intrinsically safe battery back-up units.

The Trolex solution

Alongside the systems being implemented across the tunnelling project, the Tunnel Boring Machine itself has also been fitted with multiple gas detectors, as well as Audio/Visual alarms and sensors.

Due to the nature of tunnelling projects, with fast paced demolition, excavation and drilling processes, cutting, concrete spraying and transportation generates fine dust and particulates as a by-product of natural materials like rock and sand being disturbed, increasing risk of lung diseases and respirable health issues.

The recognised risk of using combustion engines and diesel-powered equipment often produces carbon monoxide and Diesel Particulate Matter is something the project was increasingly aware of, something the system will flag through data indicators across its broad range of sensors.

Gas sensors are already actively working as the mining machine hits pockets of hydrocarbons which set the unit into alarm, and where necessary lower down the mining machine to avoid risk of explosion.

What it meant moving forward

Providing this pioneering safety technology to STRABAG meant the project has joined a long-standing reputation of safety instrumentation being supplied to workers by Trolex in some of the most challenging environments over the last 65 years.

Like many other underground industry leaders across the globe, STRABAG made the decision to deploy multiple Trolex detectors, monitoring equipment, sensors and alarms demonstrating to their workers that health and safety is a priority on this project, and a superior approach, not only for producing the highest quality throughout the tunnelling project, but also with a conscious effort on the effects relating to the workforce wellbeing and the wider society.

TROLEX TUNNELLING SOLUTIONS

Image of TX8005 AIR XD Dust Monitor
TX8005 AIR XD Dust Monitor

Image of TX6310 SENTRO X Gas Detector
TX6310 SENTRO X Gas Detector

Image of TX9165 SENTRO 8
TX9165 SENTRO 8

Image of TX6351-2 SENTRO 1
TX6351-2 SENTRO 1

Image of TX66xx Series Power Supplies
TX66xx Series Power Supplies

Image of TX6141-3 Pressure Monitoring Systems
TX6141-3 Pressure Monitoring Systems

Image of TX592x Vortex
TX592x Vortex

TROLEX CASE STUDIES

PRODUCT SALES ENQUIRIES

GET TROLEX TUNNELLING UPDATES

    You may unsubscribe from these communications at any time. For more information on how to unsubscribe, our privacy practices, and how we are committed to protecting and respecting your privacy, please review our Privacy Policy.